In the event of a storm, our crews go to work immediately, keeping in mind that their safety comes first. The first step is to restore power to as many people as possible. We do this by first restoring power to transmission lines and substations. Next, our crews work on restoring power along main circuit lines. In rural areas, these lines stretch for miles along roads into rural areas and across fields. Taps that lead off the main circuit lines are repaired next, and, finally, crews repair individual service lines to homes.
Homeowners have a responsibility for repairing the equipment and wires that interface at their home with our system, such as their service entrance. Be assured, all employees work long hours during large outages and they too, want power restored as quickly as possible. Safety and well-being is a concern for our employees. Laws necessitate and regulate that employees get regular sleep and meals during major outage operations. Pioneer Electric contracts with Security and Response Services to provide after-hours dispatching that operates 24 hours a day, 365 days a year. Pioneer Electric constantly monitors all substations, gathering real time data to alert us of any substation or circuit problems on our system.
All employees are utilized during crisis situations. We have agreements in place with other Kansas utilities, cooperatives and contractors for mutual assistance in times of crisis. Manpower and materials are transferred rapidly to our area when needed.
View the Power Restoration Infographic (PDF)
Generator Safety Report an Outage